We suggest lifting the machine with 2 people to avoid injury.
1. Open the Box
It contains the machine (including the vent hose), and the accessory box (including the manual).
2. Remove the Buffer Materials
Remove the four corners of the cushioning material and take out the machine from the carton to place it on a stable surface. Please preserve the original carton and cushioning material for future usage.
3. Examine the Accessory Box
1|Torx screwdriver
2|2.5mm hexagonal wrench
3|Double head wrench
4|Lubricating oil
5|Funnel
6|Ethernet cable
7|Double-sided tape
8|Clamp
9|Power cord
10|Wi-Fi dongle
11|Engraving sample
12|Wood piece.
4. Overview of the Machine Layout
Machine front
1 | Nozzle fastening ring
2 | Focus probe
3 | Honeycomb table
4 | Power button
5 | Touch panel
6 | Acrylic door cover
Machine back
1 | USB port
2 | Ethernet port
3 | Power port
4 | Ventilation fan
Comments
0 comments
Please sign in to leave a comment.